Successful completion of Ground Water Development at 2x660 MW Coal Fired Power Plant, Sahiwal.  1st ever 14 Days Group Pumping Test Coal Fired Power Plant, Sahiwal.     Successful completion of 75 HSDPTs at 120 MW Fatima Energy Limited Sanawan.     Feasibility Study Underway for Coca Cola Pakistan  

Environmental Engineering Division

The Environmental Engineering Division of GeoScience Associates is providing services to various industries such as Environmental approvals, Environmental Impact Assessment (EIA), Initial Environmental Examination (IEE), analytical monitoring & wastewater treatment systems. The firm operates in an environment, which is fully supported by the following Pak-EPA certified laboratories:

  • Pak Green Laboratories (Pak-EPA certified)
  • Seal Laboratories (Pak-EPA certified)
  • SGS Pakistan (Pvt) Limited

Core Competencies:

1. Ambient Air Monitoring
2. Compressed Air Monitoring
3. Stack Emissions Monitoring
4. Vehicular Emission Monitoring
5. Weather Monitoring
6. Waste Water Analysis
7. Drinking Water Analysis
8. Soil Testing
9. Initial Environmental Examination (IEE) Report
10. Environmental Impact Assessment (EIA) Report
11. Social Soundness and Impact Assessment (SSIA) Report
12. Strategic Environmental Impact Assessment (SEIA) Report
13. Environmental Compliance Report/Audit Report


Copyright © 2016 GeoScience Associates. All rights reserved.

E-mail:info@geoscience.com.pk

Phone No: +92-42-35854628
+92-42-35854629